Significant cost savings may be realised during the well planning phase by conducting an independent review of well design and planning.

The NRG team includes experienced, competent personnel who will validate and assess a draft well plan; in particular:

• Casing seat selection and option screening
• Casing string design
• Completion design and tubing stress analysis
• Drilling fluids and cementing
• Risk management
• Cost estimating

 

© Copyright ~ NRG Ltd 2003 Aberdeen

Acorn Oil and Gas | BP Exploration | Gaz De France | Total Fina Elf (UK and Angola) | Ramco Oil & Gas | Kerr McGee North Sea Ltd | Canadian Natural Resources | Conoco Philips | Amerada Hess | Ince & Co | BG Group | BG Tunisia | Global Santa Fe | Schlumberger IPM | Star Energy | Tuscan Oil | Hydrocarbon Resources | Burlington Resources | Tullow | Europa Oil & Gas | Encana | Nobel Energy
Adobe Acrobat Reader® is required to view attached documents on this site.
Click the logo above if you need to download this free software.